What Time Tracking Data Did and Did Not Change
Fourteen days of automatic tracking produced a report of nine pages. Three people read it. One change came out of it, and that change was about a meeting rather than about time.
The comparison below covers each conclusion the data supported against the ones people expected.
Total hours
The number was 41 hours a week and nobody was surprised. Total hours are the least informative metric in any tracking system and the first one produced.
Fragmentation
The useful number was the count of work periods longer than fifty minutes. There were eleven across the whole team in a week, for seven people.
That single figure explained more complaints than the rest of the report combined.
Meeting share
Meetings accounted for 31 per cent of tracked time, which is high and matched everyone’s estimate within a few points. Nobody changed anything because of it.
Data confirming a shared belief changes nothing. It has to contradict something.
The contradiction
Two people believed they were spending most of their week on support requests. The tracker showed 12 per cent. Both had been organising their week around a task that took an hour a day.
That finding produced the only real change: support was consolidated into two blocks and both reported a better week.
What could not be measured
Nothing in the data distinguished work that mattered from work that filled time. A report of nine pages covering 41 hours said nothing about whether any of it was worth doing.
Reporting format
The nine page report was read by three people. A single paragraph summary sent in week two was read by all seven and prompted two replies.
Length is a design decision and the wrong one was made first.
The two people who did not read it
Both were in roles where the week is set by other people. Their time was not theirs to reorganise, so a report about how they spent it offered them nothing.
Reporting assumes agency. Where there is no agency the report is a description of a constraint, and descriptions of constraints do not change them.
What the summary paragraph said
Eleven work periods over fifty minutes across the team, meeting share at 31 per cent, and two people spending an hour a day on support. It fitted in four lines.
Four lines were read by everyone and nine pages were read by three people. The compression was done by the same person who wrote the long version and it took twenty minutes.
Tracking accuracy
Automatic tracking attributed gaps to the previous application, which produced a category called email that was visibly too large. Nobody trusted that number and it was excluded from the summary.
Any tracker produces one number that is obviously wrong. Discovering which one takes a week.
Whether to keep it
Eleven days after the fortnight ended, the low resolution tracking was still on and nobody had looked at it. That is the honest state of most measurement.
It costs nothing and it will be useful on the day someone asks a specific question. That is a reasonable reason to keep something nobody reads.
What the two people who changed did
Both consolidated support work into two daily blocks. Both reported finishing the rest of their week earlier, which is a scheduling result rather than a time result.
Nothing about the hours changed. The arrangement of the hours did, and that was enough to change the report about the week.
The number nobody could verify
Meeting share was estimated at 31 per cent by the tracker and 45 per cent by the calendar. The difference was preparation time, which lives in neither place.
Two sources disagreeing by fourteen points is a useful outcome. It means the truth is somewhere between them and neither is being trusted too much.
What the tracker would have needed
A way to separate planned work from reactive work. Nothing in the data distinguished the two, so every hour looked equally chosen.
That distinction is the whole question for most teams and it cannot be derived from application windows. It has to be asked, and asking is what the report was trying to avoid.
After the fortnight
Tracking stayed on at the lowest possible resolution: hours per project, no application detail. The detailed view was switched off after being used exactly once.
What the data changed was one assumption held by two people. What it did not change was how anyone worked.
Photograph: Hillary for America (Public domain) · source